Completed Project(international) Brenstech October 3, 2023
Completed Project
Biogas Plant

2 MW

12,000 X 2 cum per day
  • FEEDSTOCK: Napier grass, Waste water from rubber factory
  • PLACE: Thailand
  • STATUS: Commissioned (2015)
Biogas plant

1 MW el +1 MW th

  • FEEDSTOCK: Maize Silage
  • PLACE: Pavia, Italy
  • STATUS: Commissioned 
Biogas plant
Installed agitators

IOT Mabagas

  • FEEDSTOCK:  Chicken manure, Cow manure, Sago water
  • PLACE: Namakal, India
  • STATUS: Commissioned
Biogas plant
Installed agitators

IOT Mabagas

  • FEEDSTOCK:  Chicken manure, Cow manure, Sago water
  • PLACE: Namakal, India
  • STATUS: Commissioned
Biogas plant

1.3 MW

12,000 X 1.3 cum per day
  • FEEDSTOCK: Cow Manure, Sewage sludge Milk & fruits
  • PLACE: Dubai
  • STATUS: Commissioned (2019)
Biogas plant

3.6 MW el + 3.6 MW th

  • FEEDSTOCK: Slaughter house waste, Energy crop, Pig manure
  • PLACE: Belgorod, Russia
  • STATUS: Commissioned 
Khon Kaen University
Pilot Project

  • FEEDSTOCK: Napier grass, Waste water
  • PLACE: Thailand
  • STATUS: Commissioned (2017)
Biogas plant

265 kW el

  • FEEDSTOCK: Cattle Manure
  • PLACE: Ottersbery, Germany 
  • STATUS: Commissioned 
Biogas Plant

10 MW

12,000 X 10 cum per day
  • FEEDSTOCK: Napier grass, Pineapple waste, Pig Manure, Chicken manure
  • PLACE: Philippines
  • STATUS: Commissioned (2019)
Biogas plant

500 kW el +500 kW th

  • FEEDSTOCK: Pig & Chicken Manure d
  • PLACE: Niedoradr, Polan
  • STATUS: Commissioned 
Biogas plants
in South America

  • FEEDSTOCK: Municipal Waste
  • PLACE: Chile & Brazil
  • STATUS: Commissioned (2015)